日本深夜福利在线观看-黄片在线观看一区二区-亚洲国产一区二区精品专区-亚洲久久精品一区二区三区

Your Position: Home > News > Activities

Daily Maintenance and Replacement of Roots Pump of Oil Filter

2019/8/1??????view:

  1. Regular inspection

  1.1. Daily check:

  (1) Oil level check: check the oil level of gear box and bearing box, too much oil level of gear box and bearing box, oil temperature will rise; too low oil level will cause poor lubrication of gears and bearings.

  (2) Temperature Check: Check the temperature of each part with a thermometer.

  (3) Motor load inspection: measuring motor load with power meter or current and voltmeter.

  1.2, monthly check: tension of coupling elastomer or triangular tape.

  1.3, quarterly inspection; Whether the lubricating oil in the gearbox is deteriorated or not.

  1.4. Semi-annual inspection:

  (1) Whether the lubricating oil in the bearing box of the front cover deteriorates.

  (2) Whether the mechanical seal is damaged or not.

  1.5. Check every year:

  (1) Whether the bearing is worn or not.

  (2) Whether the piston ring and piston ring bushing are worn or not.

  (3) Whether the micro-wear of gears has an effect on the normal operation of the rotor needs to be adjusted.

  2. Attentions for disassembly and assembly: Roots vacuum pump should be disassembled and reassembled according to the following precautions:

  2.1 Before disassembly, the clearances of the main and driven rotor parts must be measured and recorded.

  2.2. When disassembling, it is necessary to avoid hammering parts directly with heavy hammer. The disassembled parts should not be bruised, and should be cleaned and properly kept.

  2.3. The reasons and circumstances for the replacement of the parts to be replaced are recorded in detail.

  2.4 Before reassembly, all assembly parts must be burred and cleaned.

  2.5. The static sealing plane without gasket or sealing ring is sealed with "106" silicone rubber coating. The rubber seals used for static sealing can be coated with vacuum grease.

  2.6 The clearance of the main and driven rotors can be adjusted according to the clearance before the dismantling of the pump.

  2.7. Leakage test must be carried out after all are installed.

  2.8. After reinstallation, commissioning and necessary performance testing should be carried out before normal operation.

  3. Pump disassembly steps:

  Before removing the pump, drain the accumulated water in the pump and lubricating oil in the tank and cut off the main power supply.

  3.1. Remove the fixed end:

  1) Loosen the fastener between the motor and the motor connecting frame, then unload, refuel plug, lower motor and motor connecting frame.

  2) Remove the shaft seal (mechanical seal) pressure cap, the oil retaining disc, the garden nut and the shaft seal pressure cap.

  3) Remove the seals of the mechanical seals; (Replace the piston ring seats of the mechanical seals and install the new active shaft of the mechanical seals after 1-3 steps. );

  4) Remove the front cover; (Replace the whole set of mechanical seals, after completing 1-4 steps of piston ring, install new mechanical seals. ) Balanced mechanical seals

  5) Loosen the round nut and oil disc for the shaft; Bearing cap and ball bearing.

  6) Remove bearing cap; front cap, front cap and drain plug.

  7) Remove the bearing cap and bearing from the end cap (replace the bearing).

  Press out protective sleeve;

  Pull out the rotor and dismantle the pump.

  If Roots vacuum pump with bypass valve is used, the pressure cap of bypass valve should be removed, the valve head of bypass valve should be taken out, and the movement of the guide sleeve and the hole of the valve head should be checked for flexibility and reliability of the sealing ring.

  4. Pump loading steps:

  Before loading the pump, all parts should be cleaned and burrs removed. Attention should be paid to the sealing surface should not be oiled.

  1) Put a pair of rotors into the pump body, pay attention to the position of the long and short axis rotors, and insert a plug ruler in this position.

  2) Apply a thin layer of 106 silicone rubber evenly on the contact plane between the end cap and the pump body at both ends, and tighten the screws.

  3) Install piston ring and piston ring bushing and oil shield, and adjust the schematic diagram of rotor clearance.

  Install bearing seat, bearing and bearing locking nut and bearing pressure cap (the original removal adjustment gasket is placed in place under the fixed end bearing seat, and the bearing seat is fastened);

  Silicone rubber and tighten the front cover;

  Roots vacuum pump with bypass valve shall be equipped with relief valve head and pressure cap.

  After installing the mechanical seal cap, the coupling is installed on the active shaft. The manual disc-driven coupling should rotate flexibly and not be stuck. Finally, the motor connecting frame and motor are installed. If it is possible to test the air tightness of the pump, the dry air of 0.2-0.3 MPa can be injected into the pump, and soap liquid is applied on the sealing surfaces to check whether there is air leakage. After installing the oil discharging bolts, the pump is refuelled, and the oil level is generally about 3/4 of the oil window. Connect the power cord, the water pipe and the air inlet cap of the pump. Start the pump, pay attention to steering, if necessary, test the performance of the pump.


日本成人中文字幕一区| 成人精品网一区二区三区| 午夜精品成年人免费视频| 国产亚洲欧美日韩国亚语| 又黄又硬又爽又色的视频| 欧美日韩国产黑人一区| 国产精品视频一区二区秋霞| 日韩在线视频精品视频| 国产精品亚洲二区三区| 色综合久久中文综合网| 久久永久免费一区二区| 亚洲一区二区三区一区| 亚洲国产av在线观看一区| 中文字幕人妻一区二区免费 | 亚洲日本中文字幕视频在线观看| 欧美不雅视频午夜福利| 午夜精品国产一区在线观看| 久七久精品视频黄色的| 欧美自拍系列精品在线| 美女被草的视频在线观看| 激情偷拍一区二区三区视频| 亚洲做性视频在线播放| 五月天六月激情联盟网| 国产性情片一区二区三区| 亚洲一区二区三区国产| 日本一级特黄大片国产| 又黄又色又爽又免费的视频| 内用黄老外示儒术出处| 日本不卡在线视频中文国产| 亚洲最新一区二区三区| 国产成人精品在线一区二区三区| 小草少妇视频免费看视频| 国产亚洲不卡一区二区| 国产日韩精品欧美综合区| 国产成人亚洲综合色就色| 深夜福利亚洲高清性感| 久久热麻豆国产精品视频| 亚洲欧美日韩国产综合在线| 中文字幕日产乱码一区二区| 午夜亚洲少妇福利诱惑| 精品国产亚洲一区二区三区|